Maknalog Successfully Completes Component Delivery for the ESDM Ministry’s Solar Power Plant Revitalization Project
PT. Makna Logistik Internasional (Maknalog) proudly announces the successful delivery of key components for the Solar Power Plant (PLTS) revitalization project initiated by Indonesia’s Ministry of Energy and Mineral Resources (ESDM). The shipment, covering the route from Jakarta to Manokwari, included essential components such as solar panels, inverters, batteries, and other equipment, all aimed at supporting the energy needs of the community in Waibem, Manokwari.





To ensure a smooth distribution, the delivery process utilized both land and sea transportation. This journey spanned various terrains and challenging road conditions, but with careful planning, Maknalog efficiently managed each step. The Maknalog logistics team closely coordinated with the ESDM Ministry and engaged field technicians to ensure the process stayed on schedule.
This delivery was successfully completed on time, with professional logistics support from Maknalog ensuring that all components arrived punctually and were ready to bolster the sustainable energy supply for the Manokwari community.
Maknalog remains committed to supporting government projects that accelerate access to clean and renewable energy in Indonesia. The success of this project highlights Maknalog’s dedication to providing reliable and timely integrated logistics solutions.


